Contact the plant directly by phone to specify your project type, required yardage, delivery date, and site address. Dispatchers confirm availability, schedule your delivery window, and provide pricing based on mix design and distance. Most orders require 24-48 hours notice for scheduling, though rush delivery may be available depending on plant capacity.
Calculate cubic yards by multiplying length times width times depth in feet, then divide by 27. A standard 4-inch thick driveway that's 20 feet by 40 feet needs about 10 cubic yards. Sidewalks typically use 4 inches of depth, while driveways often require 5-6 inches for vehicle weight.
Most ready-mix plants set minimums between 1 and 3 cubic yards per delivery to cover truck dispatch costs. Orders below the minimum typically incur short-load fees that increase the per-yard price. Combining projects or coordinating with neighbors can help you meet minimums and reduce delivery costs.
Ready-mix plants deliver the base concrete mix with integral color added at the plant if requested. Stamping, coloring, and decorative finishes are applied on-site by your contractor after the concrete is poured. The plant provides the correctly proportioned mix while finishing work happens during placement.
Mix strength, measured in PSI, indicates compressive load capacity. Residential driveways typically use 3,000-4,000 PSI, while commercial slabs or heavily loaded areas require 4,000-5,000 PSI. Higher PSI mixes cost more but resist cracking under weight and freeze-thaw cycles better than lower-strength concrete.
Standard mixes remain workable for 90 minutes after water is added at the plant, though hot weather reduces this window significantly. Trucks add water during transit to maintain consistency, and drivers can adjust slump on-site. Have your site prepped, forms set, and crew ready before the truck arrives to avoid premature hardening.
Distance from the plant, order size, mix design, and delivery schedule all impact cost per yard. Loads traveling beyond the standard radius incur mileage fees, weekend or after-hours deliveries add surcharges, and specialty mixes with additives cost more than standard blends.
Yes-someone familiar with the project must be on-site to direct the driver, verify the mix design on the ticket, approve slump adjustments, and sign the delivery receipt. Drivers won't unload without site supervision because they need guidance on placement location and can't make decisions about mix acceptability.
Standard ready-mix trucks are large, heavy vehicles that need 12 feet of width, firm ground, and grades under 10% to operate safely. Steep slopes, narrow gates, or soft ground require alternative placement methods like concrete pumps or wheelbarrow relay. Discuss site access with dispatch before scheduling delivery.
Excess concrete can't be returned once mixed-you pay for the full order and must dispose of leftovers on-site. Shortages require ordering an additional load with a second delivery fee. Accurate measurement before ordering prevents both waste charges and project delays from insufficient material.
You'll need the volume in cubic yards, pour location access details, desired mix strength, and preferred delivery window. Photos or measurements of the site help confirm truck access and chute reach. Knowing whether you need pump service or standard chute delivery prevents day-of delays.
Lead time depends on season and project size. Summer and fall fill faster due to construction demand, often requiring several days' notice. Same-day delivery may be available for smaller residential pours during slower periods if trucks and batch capacity allow.
Delivery distance, minimum load requirements, Saturday or after-hours scheduling, specialty mixes, and whether a pump truck is needed all add to base yardage cost. Small orders under minimum volume typically incur a short-load fee to cover batch and delivery expenses.
Standard mixers need 10-12 feet of clearance and firm ground to avoid getting stuck. Tight access, steep grades, or overhead obstacles may require a pump truck or smaller short-load vehicle. Describing site conditions during ordering prevents equipment mismatches on delivery day.
Most mixes stay workable for 90 minutes to two hours from batch time, depending on temperature and admixtures. Heat accelerates set, cold slows it. Having your crew, tools, and forms ready when the truck backs in prevents rushed finishing and wasted concrete.
Commercial pours typically require higher PSI mixes, certified batch tickets, and coordination with inspectors or engineers. Residential jobs prioritize scheduling flexibility and smaller load sizes. Both need accurate site prep, but commercial work involves stricter documentation and mix compliance.
Permits depend on project type and scope. Commercial and civil paving projects nearly always require permits and inspections tied to engineered plans. Residential driveways and sidewalks may not, but checking with local building departments before ordering prevents compliance issues that delay the pour.
Multiply length times width times depth in feet, then divide by 27 to convert cubic feet to cubic yards. For irregular shapes, break the area into sections. Online calculators simplify this, but verifying measurements on-site catches errors before the truck is dispatched.
Forms must be set, braced, and level; subgrade compacted and at correct depth; rebar or mesh in place; and crew on-site with tools. Confirm truck access the day before. Delays in any of these areas waste workable time once the pour starts.